the position we are in now with the conq is as follows,development phase for the electronic fuel injection and ignition is over ,all the faults have been ironed out so all has been stripped off the engine to be rebuilt in a tidy and logical fashion,new wiring looms and injectors fixed in the manifolds securely,also have fitted modern high temp spark plugs and what a difference that has made as the original ones fouled up to easily,not a very inspiring job taking them out for cleaning and also new engine control box in a more accessible place with better cooling.the winch is out as is the j60 power pack to finish off the lubrication system on the winch and do a bench run,the j60 will be fitted with a 90 amp generator to power the electrical systems whilst performing winching duties,a 24v hydraulic power pack to be fitted for raising and lowering the spade as the old system is over complicated and leaks from every joint. The girder trailer is finished to transport it for a few selected shows next year
happy new year to you all