Now we know it runs we are concentrating a bit more on the cab, so we can sit on it and drive in and out of the workshop rather than push it in and out every day! The square tyres on the rear dont help, but they will be sorted this week.
The bulkhead is in place and the rebuilt control box is fitted so the electrics can begin to be wired up. Handbrake lever mechanism has also been given "the treatment" and is back on.
The brake lines have been replaced, along with the flexy hoses, and the copious amount of grease nipples, that luckily I found lying round on the back shelf of the workshop under a layer of dust!
This week will hopefully see the other 2 tyres done, a piece of the front chassis crossmember replaced and the cab floor in place.