abn deuce Posted September 21, 2010 Share Posted September 21, 2010 Found these two clips on youtube showing loading ,unloading and use of airportable equipment ,it does mention the aircraft using a temperary runway to bring in the men and equipment which would make you wonder why the enemy would give up a field that still had some use but enjoy the clips . part one Something went wrong... part two Something went wrong... Quote Link to comment Share on other sites More sharing options...
airportable Posted September 21, 2010 Share Posted September 21, 2010 Great film, thanks very much. Andy. Quote Link to comment Share on other sites More sharing options...
gritineye Posted September 21, 2010 Share Posted September 21, 2010 very interesting films, thanks, not too sure how the asphalt worked though.. Quote Link to comment Share on other sites More sharing options...
abn deuce Posted September 21, 2010 Author Share Posted September 21, 2010 (edited) By putting the asphalt on top and then mixing it with the top layer and repeat a couple of times you make a smooth surface , tough enough for temperary use I m sure its a simular method that has been used in concrete road construction if the base soil is sandy gravaly you add cement and water then mix and level . Edited September 21, 2010 by abn deuce Quote Link to comment Share on other sites More sharing options...
Recommended Posts
Join the conversation
You can post now and register later. If you have an account, sign in now to post with your account.