With work being rather difficult to find recently, coupled with some rather expensive engineering work to pay for, I have found myself plumetting towards the festive season with insufficient funds. I have therefore taken on some highly decorative fairground work, which is outside my normal scope of operations. This has been taking all my attention recently, leaving little time for project Thornycroft.
However I have now recovered the refurbished cylinder blocks from Paynes, which have been bored and linered to Standard A. (4.5") the valve guides were sleeved and bored to suit the new va