No assembly work done today but time spent searching for bits in the "Spares Dept" for the next job. We are aiming to have the front of the lorry completed as far as possible soon. The main front springs are ready for assembly but this Lorry has "Helper" or "Booster" springs on the front axle. This secondary spring is a coil spring which sits in a shoe and the shoe in turn is clamped on the centre of the front axle. This will bear on the chassis rail above if it becomes activated for any reason. But the Spares Dept sadly only yielded one spring and shoe so it rather looks as if we have to make the second. A pity

DSCN0064.JPG

DSCN0065.JPG

DSCN0066.JPG

DSCN0067.JPG

Link to comment
Share on other sites

A search also made in the "Spares Dept" for Radiator Mounts. Each are a two parts casting with two springs and are mounted on the inside of the chassis rail, right behind the Headlights Bracket on the outside of the rail so that the two castings share some of the mounting bolts. We found the remains of about five but they are all in a shocking condition - we may be lucky enough to make one out of them. We also found the two parts which had previously been separated from another one which are good enough to use again - but we will want new springs for any that we can use. Pictures also there of the same mounts on the main complete chassis and if it comes to the worst, we could "borrow" these to keep the momentum going!

DSCN0062.JPG

DSCN0063.JPG

DSCN0073.JPG

DSCN0074.JPG

DSCN0075.JPG

DSCN0076.JPG

DSCN0077.JPG

Link to comment
Share on other sites

Theoretically if they got enough use the ball track grooves and ball diameters could accumulate enough wear between them that the balls could space out / bunch up.  

If you have a look at the worn ones pictured I'd guess they have forty years of wear on them, and the primary damage looks to have been pitting from standing, so good luck driving one of these trucks far enough for ordinary wear to become a problem.

When they are being rebuilt now, it would make sense to rebuild them with brand new balls, possibly slightly oversize to accommodate the existing wear / rework on the ball tracks, and then forget about them for the next hundred years.

Link to comment
Share on other sites

Just a little time spent today assessing the Helper Spring and the Radiator Supports. All heavily rusted and given a quick clean but the Helper Spring is in good order - but we only have one - the second one will be needed pretty soon if we want to get the front wheels on shortly. The spring shoe is a casting and in the present circumstances, we will have to fabricate it. The helper Springs and the Radiator Springs are identical spec - but obviously different lengths. The spring section is about 7/16". Lengths - see pictures.
The Centre Pin of the Radiator Mount is 3/4" diameter and is riveted over at each end to retain it in the main body of the set-up.

DSCN0081.JPG

DSCN0082.JPG

DSCN0083.JPG

DSCN0084.JPG

DSCN0085.JPG

DSCN0086.JPG

DSCN0087.JPG

DSCN0088.JPG

DSCN0089.JPG

DSCN0090.JPG

DSCN0091.JPG

DSCN0092.JPG

DSCN0093.JPG

Link to comment
Share on other sites

The "feather" is a small peg which is a tight push fit into the body of the pin right behind the hex head which matches a slot in the body of the clevis so that it will stop the pin revolving in its matching female hole. Tim has some pictures which I guess he will post today.

Tony

Link to comment
Share on other sites

Returned to painting wheels today after cleaning them - they have now had two coats of primer and two coats of undercoat and are looking OK - it rather looks like they are going to need three coats of top coat.
With several bits now ready to be hung on the chassis, the arrival of the heavy gang - the men from the north is awaited! The two axles and rear springs are ready - the front springs are already on. The back axle can also go on but as mentioned previously the U Bolts which hold the front axle to the springs also holds the helper or secondary coil springs and we only have one of those so a second one will have to be made - difficult at the present time. The shoe for the spring is 3/8" thick so as a temporary measure, a piece of 3/8" plate has been cut same as the overall dimensions of the shoe that we have - and it may be that this can be used later to make the second shoe but this can wait until we have a spring for it. In the mean time, this bit of plate can be used as a stand in for the missing shoe. The pictures show the set up.

DSCN0028.JPG

DSCN0029.JPG

DSCN0034.JPG

DSCN0035.JPG

DSCN0036.JPG

DSCN0037.JPG

Link to comment
Share on other sites

There does not seem to be a great deal to show for my efforts today but I picked up all 5 Hub Caps that were already loose in the Spares Dept. I thought initially that the ones for the Back Wheels were bigger than the ones for the fronts but in fact they are all the same size. Dug out and scraped all the loose paint and rust initially together with any grease - this is really where we miss the services of our Sand Blasting friend but he is not accessible at the present time. The Hubcaps were then washed down and left to dry. The next stage will be to select the best two and clean them up with an electric wire brush and ensure that the Pinch Bolts are working. The remaining three can wait until Sand Blasting services are available again!

DSCN0038.JPG

DSCN0040.JPG

DSCN0045.JPG

DSCN0047.JPG

DSCN0050.JPG

  • Like 2
Link to comment
Share on other sites

Selected the best two from the 5 Hub Caps that we had in the Spares Dept - very rusty and cleaned them up with a rotary wire brush. Washed them with cellulose thinners - cleaned up the internal thread with tooth brush size wire brush and cellulose thinners again, and they screw comfortably on to the wheel hubs. The Pinch Bolts are sound but an unusual thread again - 5/16 x 20 UNS. Gave the hub caps a coat of Bonda Primer to finish the day.

W1.JPG

W2.JPG

W3.JPG

W4.JPG

W5.JPG

  • Like 1
Link to comment
Share on other sites

Today's job was to have a go at the Radiator Mounts - there is a small selection of them in the "Spares" Department but everyone of them is scabby and has seen better days. The first of the better two has already been worked on - many years ago by the look of it and the two springs have been taken out and are missing. The assembly consists of one main bracket to hold two springs inside it - one above and one below another casting which actually supports the Radiator - the springs are designed to absorb any minor movement in the Radiator from any shock during running. A piece of 3/4" diam steel bar runs through the assembly and is riveted over top and bottom in the main casting with the springs inside it. There are two "Top Hat" washers with a 3/4" hole in them to take the bar and the narrow part of the "Top Hat" goes inside the springs, top and bottom of each spring. Two compression springs - four "Top Hats".

The one complete assembly was very heavily rusted and took considerable effort and heat to get it apart. One spring had broken into two and the remaining whole one is beyond use again. They are 2" diam with a free length of about 1 3/4". Although these castings are heavily pitted, they will clean up and be good enough to use again.

DSCN0068.JPG

DSCN0070.JPG

DSCN0072.JPG

DSCN0073.JPG

DSCN0075.JPG

DSCN0080.JPG

DSCN0081.JPG

DSCN0084.JPG

DSCN0086.JPG

Link to comment
Share on other sites

Most of the work on the front end which was manageable by the depleted work force in the south is now done, and was put to one side until more muscle is available for the final assembly of it.
So in the meantime, we look further back along the chassis for something that can be manageable by limited manpower. We look at the Back Brake Band assembly and the Radius Rod and Chain Assembly tensioner. This a separate unit and very fortunately, we have several in the Spares Department. They must all be looked to find the best ones - remembering that the Brakes are handed. Two have already been taken apart which makes those bits manageable but others are still together and are heavy which brings in own problems in the present circumstances!
So disassembly and cleaning for assessment.

DSCN0090.JPG

DSCN0092.JPG

DSCN0095.JPG

DSCN0096.JPG

DSCN0097.JPG

DSCN0098.JPG

DSCN0099.JPG

DSCN0100.JPG

  • Like 1
Link to comment
Share on other sites

Now looking to the next step - stripping down some of the bits in the Spares Department so that they are ready for cleaning, assessment and re-use. Heat required first of all on most of them as they have been rusted together for many years - not a very exciting job! We have two Peerless Radiators - neither in very good condition and only one Filler Cap - which is broken - so this might be a good time to make up a couple of new ones - using the broken one as a pattern - and assuming that one is original - we are not too sure about that as the ones in some of the old pictures look quite different

DSCN0102.JPG

DSCN0104.JPG

DSCN0105.JPG

DSCN0106.JPG

DSCN0107.JPG

DSCN0108.JPG

DSCN0109.JPG

DSCN0110.JPG

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...