With the correct paperwork through, the Valentine is ready for transport. Final water blasting and checking we loaded onto the flat rack. I had to extend the side of the rack , as they only come in at 2.2m wide, and we need at least 2.5m for the track to be properly supported. Once this was achieved I brought in my 40ton crane for the lift. After lifting and positioning it a few times  to get the correct location on the rack, we were in the final stages of lowering and were only a couple of inches off the deck, when how typical, the main pump hose blew on the crane!....call in the hose doctor for a fix. She has about 85tons of restraints on her. These are all inspected by a Marine Surveyor to certify the shipment for boarding onto the ship. Next in we have the swing lift which loads onto the truck in a minute and then gone. Cheers from The Tank Factory...........until next time!

DSCF8947.JPG

DSCF8968.JPG

DSCF8969.JPG

  • Like 2
Link to comment
Share on other sites

  • 3 months later...
  • 2 years later...

Hi

Pictures are excellent. I am busy building a 1:6 model of the Valentine and need hobbles of information. Are there a manual available that you use to rebuild this project and how do I obtain one.

 

Thanks

Joahn Victor

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...