I looked at the rear inner guard boxes as they will be ready for use soon. These had been blasted and primed but on closer inspection there is a few too many areas that will need patching and a lot of shape to put back in. I think new ones are in order. I will take the box from this rusty old side and disassemble it as a pattern.

Attached Thumbnails attachment.php?attachmentid=88527&stc=1&thumb=1&d=1486520792 attachment.php?attachmentid=88528&stc=1&thumb=1&d=1486520792

Link to comment
Share on other sites

I completed another patch to go in the chasis where the battery had rusted a hole in the firewall. I cut out the damaged section and formed up a patch. It needs a curved rib formed in the centre so first I did two folds. I don't have a folder but I find you can do a lot with angle iron and G clamps.

Attached Thumbnails attachment.php?attachmentid=88529&stc=1&thumb=1&d=1486521033 attachment.php?attachmentid=88530&stc=1&thumb=1&d=1486521033 attachment.php?attachmentid=88531&stc=1&thumb=1&d=1486521033

Link to comment
Share on other sites

Oops! Second photo above not correct.

 

I also got the reinforcing panel around the handbrake added in. There was a dent in the hump I couldn't get out. By placing the panel in position and bolting the handbrake down it pulled the dent up and held it in place while I plug welded the drilled holes. A bit of clamping and tipping th body side to side to get a better welding position.

Attached Thumbnails attachment.php?attachmentid=88650&stc=1&thumb=1&d=1486956725 attachment.php?attachmentid=88651&stc=1&thumb=1&d=1486956725 attachment.php?attachmentid=88652&stc=1&thumb=1&d=1486956725 attachment.php?attachmentid=88653&stc=1&thumb=1&d=1486956725 attachment.php?attachmentid=88654&stc=1&thumb=1&d=1486956725

Link to comment
Share on other sites

While I had the body lifted on my gantry I took the opportunity to install new shackle bushes in the front. It took every bit of pressure I could wring out of this G clamp to get them to push in.

After that it was time to wipe a bit more filler around and tidy up some of the welds and other imperfections.

Attached Thumbnails attachment.php?attachmentid=88655&stc=1&thumb=1&d=1486957037 attachment.php?attachmentid=88656&stc=1&thumb=1&d=1486957037 attachment.php?attachmentid=88657&stc=1&thumb=1&d=1486957037

Link to comment
Share on other sites

  • 1 month later...

More news from Jack Neville "got all the filler rubbed back before I took off for Corowa for the week. I gave the body a thorough going over with fishoil and sealed all the seams with butyl mastic. The week in Corowa gave it a chance to dry out so it was ready to paint when I got home." Attached Thumbnails attachment.php?attachmentid=89320&stc=1&thumb=1&d=1490866445 attachment.php?attachmentid=89321&stc=1&thumb=1&d=1490866445 attachment.php?attachmentid=89322&stc=1&thumb=1&d=1490866445

Link to comment
Share on other sites

Now that the body is painted the previously rebuilt axles, springs, dampers and steering gear can go straight on. The front torsion bar was really hard to align and required the use of a porta power to push the axle mount forward and the chainblock to pull the axle up. To stop the whole front end lifting I had to put a piece of timber under my gantry cross beam to work against the chainblock.

 

My gantry spans the width of my shed and travels on rollers the full length of the shed. It is made from railway line and other scrap. It enables me to pick up anything and move it to anywhere in the shed. The railway line is supported on steel posts which also double as the support posts of the shelving when I built the shed. Makes life very easy.

Attached Thumbnails attachment.php?attachmentid=89333&stc=1&thumb=1&d=1490868073 attachment.php?attachmentid=89334&stc=1&thumb=1&d=1490868073 attachment.php?attachmentid=89335&stc=1&thumb=1&d=1490868073

Link to comment
Share on other sites

  • 1 month later...

Heres some more news from the House of Neville skunkworks!

 

PS if anyone has leads on getting a Solex 30 HBFDO Carbie, I'd be very interested

 

 

 

 

 

 

"Chris has got the roofs painted while I repaired a second set of seat bases. We had one complete set and the other only had the bottom parts. They are only made from 1" angle iron so it was pretty straight forward to cut and drill and rivet the top section.

Attached Thumbnails attachment.php?attachmentid=89705&stc=1&thumb=1&d=1491734107 attachment.php?attachmentid=89706&stc=1&thumb=1&d=1491734107"

Edited by Chris_Collins
Link to comment
Share on other sites

The Tilly tank has a big hole in the bottom and I suspect a very untidy interior. They share the same stamped end and flanges for filler necks and guages. So I opened up the car tank and removed one end and baffle. Looking at the end I am contemplating getting some steel plates lazar cut and pressing some new end pieces in the same pattern. However before I try that I sweated that one end apart. It looks solid and might be able to be cleaned up and re-zinced. If I can recover all four ends and the baffles and recondition them I will just have to fold up the body of the tank and solder all the parts back together.

Attached Thumbnails attachment.php?attachmentid=90137&stc=1&thumb=1&d=1492849807 attachment.php?attachmentid=90138&stc=1&thumb=1&d=1492849807 attachment.php?attachmentid=90139&stc=1&thumb=1&d=1492849807 attachment.php?attachmentid=90140&stc=1&thumb=1&d=1492849807

Link to comment
Share on other sites

Both ends and baffles have been removed and they will clean up quite well. There is no rust to worry about so I melted off all the solder and removed the drain plug fitting, and the fuel line pick up and fuel gauge float. The flanges for them were sweated off and cleaned up. I will get a piece of galvanized iron and shape up for the replacement body and solder it back together. If needed maybe some POR 15 fuel tank sealer to cover the ends.

Attached Thumbnails attachment.php?attachmentid=90166&stc=1&thumb=1&d=1492941451

Link to comment
Share on other sites

The tanks are 865mm long and I had to work out a way of folding the curves in to follow the seams in the end flanges. A bit of scrap steel and pipe and the old G clamps into action again. I used a piece of 100 mm heavy steel channel and a piece of 50mm pipe and welded some scrap in the inside of the channel to centre the pipe. The four locking pliers help centre the sheet where I want it to be without moving until there is some load on the sheet.

Attached Thumbnails attachment.php?attachmentid=90295&stc=1&thumb=1&d=1493544372

Link to comment
Share on other sites

I checked each fold in the end flange as I went. It was a little bit of guesswork as to exactly where the next fold was to be positioned but I managed to get it pretty close. Once the four folds were done the lap joint was closed up. To keep the joint nice and tight I forced a couple of pieces of timber inside.

Attached Thumbnails attachment.php?attachmentid=90300&stc=1&thumb=1&d=1493545532 attachment.php?attachmentid=90301&stc=1&thumb=1&d=1493545532

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...