Jump to content

AEC distribution panel


Recommended Posts

Ok glad you put the FV designation because there is Panel, Distribution, No.1 Mk 1 & also Box, Distribution, No.1 Mk 1.

 

The Box repairs are in EMER POWER P 164/1 (Part 1)

 

There is a circuit diagram on page 64 of this:

 

http://hmvf.co.uk/pdf/ALL%20CHARGED%20UP%204%20ver4-1.pdf

 

Bear in mind even when the circuit breakers are open there will still be through resistance of 165-191 ohms

 

Unlike a trip switch they need a sustained period of overload

30A breaker

35A for 15 mins

60A for 15-50 secs

100A for 4-6 secs

 

10A breaker

11A for 15 mins

20A for 10-25 secs

Link to comment
Share on other sites

Join the conversation

You can post now and register later. If you have an account, sign in now to post with your account.

Guest
Reply to this topic...

×   Pasted as rich text.   Paste as plain text instead

  Only 75 emoji are allowed.

×   Your link has been automatically embedded.   Display as a link instead

×   Your previous content has been restored.   Clear editor

×   You cannot paste images directly. Upload or insert images from URL.

×
×
  • Create New...